Marmaray CR3

EMPLOYER:

OHL

END DATE:

2018

LOCATION:

Pendik Yeraltı Çarşısı, İstanbul

LENGTH:

480

DEPTH:

34

DIAMETER:

762

FLOOR TYPE:

Sert Kaya

DB.KAB.17

EMPLOYER:

TEIAS

END DATE:

2020

LOCATION:

Su Pompa İstasyonu

REASON FOR YYS CONSTRUCTION:

Su Pompa İstasyonu

LENGTH:

324

DEPTH:

6

DIAMETER:

2x762

FLOOR TYPE:

Kil / Çakıl

DB.KAB.20

EMPLOYER:

LS Cable

END DATE:

2022

LOCATION:

Tren Rayları Geçişi

REASON FOR YYS CONSTRUCTION:

Tren Rayları Geçişi

LENGTH:

209

DEPTH:

6

DIAMETER:

762

FLOOR TYPE:

Kil / Çakıl

HKABY.3

EMPLOYER:

TEIAS

END DATE:

2022

LOCATION:

Zirve Caddesi Kavşağı, Ankara

REASON FOR YYS CONSTRUCTION:

Yoğun Trafik

LENGTH:

213

DEPTH:

6

DIAMETER:

2x762

FLOOR TYPE:

Kil

DB.KAB.20

EMPLOYER:

LS Cable

END DATE:

2023

LOCATION:

Kroman Çelik, Gebze

REASON FOR YYS CONSTRUCTION:

Dere, Tren Rayları, Yol Geçişi

LENGTH:

248

DEPTH:

11

DIAMETER:

2x610

FLOOR TYPE:

Sert kaya

DİNAR DISTRIBUTION CENTER ELECTRICAL WORKS

EMPLOYER:

TEDAŞ AFYON ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1992

KEMALPAŞA 154 KV PLANT CABLE FEEDER

EMPLOYER:

AKENERJİ ELK.ÜRET. OTOPRODÜKTÖR GRUBU A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

2005

LOCATION:

Kemalpaşa

CONTRACT YEAR:

2004

YALOVA 154 KV TRAFO MERKEZİ - TEİAŞ YALOVA II SS (ÇİFLİKKÖY) SINGLE CIRCUIT 1272 MCM 154 KV OHL

EMPLOYER:

AKENERJİ ELK.ÜRET. OTOPRODÜKTÖR GRUBU A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

9,72 km

END DATE:

2006

LOCATION:

Çiftlikköy

CONTRACT YEAR:

2004

SUBSTATION / OHL / GERMENCİK TRANSFORMER TEDAŞ CONNECTION AGREEMENT CONSULTANCY WORKS

EMPLOYER:

GÜRMAT ELEKTRİK ÜRETİM AŞ.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

2006

LOCATION:

Germencik

CONTRACT YEAR:

2006

TRABZON EREKLİ - AKOCAK REGULATOR - AKOCAK HEPP PROJECT 154 KV OHL , LINE FEEDER AND COMMINICATION SYSTEMS

EMPLOYER:

AKENERJİ ELK.ÜRETİM A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

34 km

END DATE:

2007

CONTRACT YEAR:

2006

ULUABAT KUVVET TUNNEL - HEPP PROJECT 154 KV OHL, LINE FEEDER AND CIRCUIT BREAKER

EMPLOYER:

AKENERJİ ELK.ÜRET. OTOPRODÜKTÖR GRUBU A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

27,76 km

END DATE:

2007

CONTRACT YEAR:

2005

FEKE I REGULATOR - HEPP PROJECT - FEKE II DAM - HEPP PROJECT 34 KV OHL VE 400 KVA TRANSFORMER AND 154 KV OHL , LINE FEEDER, COMMUNICATION SYSTEMS

EMPLOYER:

AKKUR ENERJİ ÜRETİM TİCARET VE SANAYİ AŞ.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

77,70 km

END DATE:

2010

CONTRACT YEAR:

2007

154 KV ANDIRIN SS 2 X 154 KV LINE FEEDER, 154 KV FEKE HAVZA SS, 154 KV ANDIRIN SS 154 KV DOUBLE CIRCUIT 54 KM 2*1272 MCM OHL, 154 KV FEKE HAVZA SS 154 KV SINGLE CIRCUIT 7 KM 795 MCM OHL

EMPLOYER:

AKKUR ENERJİ ÜRETİM TİCARET VE SANAYİ AŞ.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

61,00 km

END DATE:

2010

LOCATION:

Andırın

CONTRACT YEAR:

2009

154 KV 39,68 KM DOUBLE CIRCUIT 1272 MCM AND OPGW, 30,43 KM SINGLE CIRCUIT 1272 MCM AND OPGW, KANDİL HEPP SS - ELBİSTAN B SS OHL. 154 KV, 2,8 KM, SINGLE CIRCUIT KANDİL HES SS-DAĞANKÖY SS CONDUCTOR STRINGING WORKS

EMPLOYER:

ENERJİSA ENERJİ ÜRETİM A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

72,91 km

END DATE:

2012

LOCATION:

Elbistan

CONTRACT YEAR:

2012

380 KV ERZİN SS 17 KM 3B 1272 MCM OHL, 380 KV TESÇELİK SS 16 KM SINGLE CIRCUIT 3B 1272 MCM OHL, 2 LINE FEEDERS

EMPLOYER:

EGEMER ELEKTRİK ÜRETİM A.Ş.

VOLTAGE SERVICE:

380 kV

PROJECT AMOUNT:

33,00 km

END DATE:

2013

CONTRACT YEAR:

2011

154 KV , 0,5 KM, 1X795 MCM OHL DOĞANÇAY HEP - KAVŞAK BENDİ HEPP OHL

EMPLOYER:

ENERJİSA ENERJİ ÜRETİM A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

0,50 km

END DATE:

2013

CONTRACT YEAR:

2012

Akenerji GIS SS - Kemalpaşa SS

EMPLOYER:

AKENERJİ ELK.ÜRETİM A.Ş.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

9.048,00 m

END DATE:

2005

CONTRACT YEAR:

2004

TKABY.23; Bornova SS - Alsancak GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

TKABY.27; Kayseri 1 GIS SS - Kayseri 2 SS (Brş)

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

21.417,39 m

END DATE:

2016

CONTRACT YEAR:

2015

TKABY.28; Kayseri 1 GIS SS - Kayseri 3 SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

24.682,29 m

END DATE:

2016

CONTRACT YEAR:

2015

Konya 2 SS - Konya Çimento SS

EMPLOYER:

KONYA ÇİMENTO SANAYİ A.Ş. / KONYA CEMENT CORP.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

8.835,00 m

END DATE:

2017

CONTRACT YEAR:

2016

TKABY.34; (Varsak-Serik) Brş. N. - Belek GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

1.749,24 m

END DATE:

2017

CONTRACT YEAR:

2016

3.YK1; Bornova SS - Alsancak GIS SS Repair

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

240,65 m

END DATE:

2017

CONTRACT YEAR:

2017

İSTANBUL NEW AIRPORT GIS SS GIS - TRF Works

EMPLOYER:

GE/ GENERAL ELECTRIC

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

700,00 m

END DATE:

2017

CONTRACT YEAR:

2016

TKABY.36; Tepeören (10 Nolu Direk) SS-Kurtköy SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

23.690,43 m

END DATE:

2018

CONTRACT YEAR:

2016

Bozyaka - Hatay

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

18,50 m

END DATE:

2018

CONTRACT YEAR:

2018

Marmaray CR3 Project

EMPLOYER:

OHL / OBRASCON HUARTE LAIN S.A

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

12.534,00 m

END DATE:

2018

CONTRACT YEAR:

2012

Marmaray Project (GIS - TRF Connetions)

EMPLOYER:

ABB

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

445,00 m

END DATE:

2018

CONTRACT YEAR:

2012

TKABY.45; Bornova 380 GIS SS Brş. N.-Piyale GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

12.153,00 m

END DATE:

2019

CONTRACT YEAR:

2017

TKABY.43; Petkim SS - Aliağa 1 GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

8.165,73 m

END DATE:

2019

CONTRACT YEAR:

2017

Bahribaba GIS SS GIS - TRF Works

EMPLOYER:

GE / GENERAL ELECTRIC

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

304,00 m

END DATE:

2020

CONTRACT YEAR:

2017

TKABY.48; Bahribaba GIS SS - Hilal GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

14.760,00 m

END DATE:

2020

CONTRACT YEAR:

2017

TKABY.49; Kartal GIS SS - İçmeler SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

29.427,36 m

END DATE:

2020

CONTRACT YEAR:

2017

TKABÇY.6; Sağmalcılar GIS SS - Yıldıztepe GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

380 kV

PROJECT AMOUNT:

31.065,00 m

END DATE:

2020

CONTRACT YEAR:

2017

3.YK2; (Güzelyalı -Ilıca) Brş. N. - Narlıdere GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

390,00 m

END DATE:

2021

CONTRACT YEAR:

2017

DB.KAB.17; (Ümitköy-Çiğdem) Brş. N. - Bilkent GIS SS

EMPLOYER:

TEİAŞ / DÜNYA BANKASI / WORLD BANK

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

28.290,00 m

END DATE:

2021

CONTRACT YEAR:

2019

DB.KAB.20; Tepeören SS - Deri OSB GIS SS - Kromançelik GIS SS - Gebze GIS SS

EMPLOYER:

TEİAŞ / DÜNYA BANKASI / WORLD BANK

VOLTAGE SERVICE:

400 kV

PROJECT AMOUNT:

103.650,00 m

CONTRACT YEAR:

2021

HKABY.3; (Ümitköy-Sincan) Brş. N. - Bağlıca GIS SS

EMPLOYER:

TEİAŞ / TURKISH ELECTRICIY TRANSMISSION CO.

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

29.700,00 m

END DATE:

2023

CONTRACT YEAR:

2022

DİNAR DISTRIBUTION CENTER ELECTRICAL WORKS

EMPLOYER:

TEDAŞ AFYON ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

YENİMAHALLE – ÇAYYOLU LV + MV FACILITIES

EMPLOYER:

TEDAŞ ANKARA ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1994

CONTRACT YEAR:

1992

AYVALIK-GÖMEÇ LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1994

CONTRACT YEAR:

1993

ALTINOLUK VE BURHANİYE LV + MV FACILITIES92

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1994

CONTRACT YEAR:

1993

HAVRAN TOPRAK SULV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1994

CONTRACT YEAR:

1993

HAVRAN KÖYLERİ LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1994

CONTRACT YEAR:

1993

D.KÖY A.PINAR İSMAİLLER AND KULAK KÖK CONSTRUCTION AND INSTALLATION

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1996

CONTRACT YEAR:

1995

EDREMİT KSS LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1997

CONTRACT YEAR:

1996

GÖNEN TUZAKÇI AND BUĞDAYLI VILLAGES LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1997

CONTRACT YEAR:

1996

BALIKESİR KEPSUT LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1998

MANYAS B.PINAR, AKÇAOVA, SÜLEYMANLI, B.AĞAÇ VE GÖKKÖY LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

1998

CONTRACT YEAR:

1997

BALIKESİR SINDIRGI LV + MV FACILITIES

EMPLOYER:

TEDAŞ BALIKESİR ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

2000

CONTRACT YEAR:

1998

TOKAT MERKEZ LV + MV FACILITIES

EMPLOYER:

TEDAŞ TOKAT ELEKTRİK DAĞITIM MÜESSESESİ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

2002

CONTRACT YEAR:

2000

ŞARKÖY 2.KISIM LV + MV FACILITIES

EMPLOYER:

TEDAŞ DAĞITIM HAT VE ŞEBEKELERİ PROJE VE TESİS MÜDÜRLÜĞÜ

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,00 lot

END DATE:

2004

CONTRACT YEAR:

2000

ADIYAMAN BURÇBENDİ HEPP FACILITIES 34 KV OHL., 34,5 KV LINE FEEDER VE 400 KVA TRANSFORMER

EMPLOYER:

AKKUR ENERJİ ÜRETİM SAN.TİC.A.Ş.

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

12,00 km

END DATE:

2007

CONTRACT YEAR:

2007

AYYILDIZ WPP PROJECT 34,5 KV OHL, LINE FEEDER, PLANT ELECTRICAL WORKS

EMPLOYER:

AKENERJİ ELK.ÜRETİM A.Ş.

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

2,70 km

END DATE:

2009

CONTRACT YEAR:

2007

BULAM REGULATOR AND HPP PROJECT 34,5 KV OHL , 34,5 KV LINE FEEDER AND 400 KVA TRANSFORMER

EMPLOYER:

MEM ENERJİ ELEKTRİK ÜRETİM SANAYİ VE TİCARET AŞ.

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

1,27 km

END DATE:

2009

CONTRACT YEAR:

2009

ADIYAMAN BURÇBENDİ HEPP - ATATÜRK SS (KARABABA), 34,5 KV OHL

EMPLOYER:

AKKUR ENERJİ ÜRETİM TİCARET VE SANAYİ A.Ş.

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

13,36 km

END DATE:

2010

CONTRACT YEAR:

2009

MARMARAY CR3 PROJECT MV WORKS, 34,5 KV CABLE, MV CUBICLES, TRANSFORMERS

EMPLOYER:

OHL / OBRASCON HUARTE LAIN S.A

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

68,50 km

END DATE:

2015

CONTRACT YEAR:

2014

AYYILDIZ WPP EXTENSION PROJECT, 34,5 KV CABLE, CRANE PADS, ACCESS ROADS, FOUNDATION WORKS

EMPLOYER:

AKENERJİ ELK.ÜRETİM A.Ş.

VOLTAGE SERVICE:

34,5 kV

PROJECT AMOUNT:

20,10 km

END DATE:

2016

CONTRACT YEAR:

2016

DB.KAB.17; Mancarlık GIS SS - Antalya GIS SS

EMPLOYER:

TEİAŞ / DÜNYA BANKASI / WORLD BANK

VOLTAGE SERVICE:

154 kV

PROJECT AMOUNT:

17.100,00 m

CONTRACT YEAR:

2023